Dart Mining announced that it has intersected high grades of molybdenum of up to 0.63% at the Unicorn project near Corryong in north east Victoria.
Highlights include:
1. Up to 0.63% Mo within quartz stock work intersected in DUNDD005;
2. 436 meters 0.05% Mo DUNDD005 and
3. 423 meters 0.05% Mo DUNDD004/4A with 72 meters 0.2% Cu and 4 gram per tonne Ag.
Drillhole DUNDD006 is now underway, currently at 68 meters depth and will define the southern margin of the stock work zone know to lie above the M1 mantos. The hole will also target an extensive breccia system outcropping to the south of the stockwork zone. Visible molybdenum in outcrop has been noted near the contact of the silica cap and the breccia.
Highlights include:
1. Up to 0.63% Mo within quartz stock work intersected in DUNDD005;
2. 436 meters 0.05% Mo DUNDD005 and
3. 423 meters 0.05% Mo DUNDD004/4A with 72 meters 0.2% Cu and 4 gram per tonne Ag.
Drillhole DUNDD006 is now underway, currently at 68 meters depth and will define the southern margin of the stock work zone know to lie above the M1 mantos. The hole will also target an extensive breccia system outcropping to the south of the stockwork zone. Visible molybdenum in outcrop has been noted near the contact of the silica cap and the breccia.
Copyright © 2013 Ferro-Alloys.Com. All Rights Reserved. Without permission, any unit and individual shall not copy or reprint!
- [Editor:editor]
Tell Us What You Think